ladle slide gate plates 1 Preparation of refractory mud: Phosphate mud and graphite powder in accordance with the ratio of 2: 1 poured in the mud bucket, the powder particles or debris in the group have to pick the net uniform mixing plus 20% diluted with water , Mix evenly, and covered with plastic paper to prevent dust, debris, etc. into the refractory mud. 2 Check the fire-resistant clay, skateboard brick, brick nozzle quality and site reserves, when the mud appears wet caking, skateboards and bricks do not meet the acceptance criteria prohibit the use of. 3 Check to confirm the work of two hot fix hydraulic station, working pressure should meet 12 ~ 15Mpa, cantilever crane rotation, lifting and other working conditions are normal, there are problems in time to contact the maintenance staff to deal with. 4 Check All kinds of energy medium pipeline, fittings, valves, hoses no leakage point, there is a leak must contact the handle before use. 5 All kinds of tools used in productio